Morrinsville WasteWater Condition Assessment, Analysis & I/I Program. 9.5km 5 Catchments.
|
|
Client: Matamata Piako District Council.
|
|
Project managed smoke testing, cleaning and CCTV investigations of sewers in the CBD and surrounding residential areas. Conduct sewer condition analysis of CCTV data. Prepare schedules, program maintenance works and identifying capital works for tender.
Project complexities: Process development & Management Systems.
|
Te Aroha WasteWater Renewals Contract. 1500m.
|
2009 |
Client: Matamata Piako District Council.
|
Contract value $432,027
|
Professional services to scope, survey, design and prepare contract documentations for sewers identified from the CCTV condition assessment and analysis phase. Project complexities: Methodology and existing services.
Project complexities: Methodology and existing services.
|
Te Aroha WasteWater Condition Assessment, Analysis & I/I Program. 5km 3 Catchments.
|
2009
|
Client: Matamata Piako District Council.
|
|
Project managed smoke testing, cleaning and CCTV investigations of sewers in the CBD and surrounding residential areas. Conduct sewer condition analysis of CCTV data. Prepare schedules, program maintenance works and identifying capital works for tender.
Project complexities: Process development & Management Systems.
|
Gordon Avenue WasteWater Renewal. 417m.
|
2008 |
Client: Matamata Piako District Council.
|
Estimated contract value $334,905
|
Professional services to investigate, survey, design and prepare plans and estimates of a problematic sewer line experiencing significant infiltration.Project complexities: Very poor ground conditions, high water table and shallow pipe gradients.
Project complexities: Very poor ground conditions, high water table and shallow pipe gradients.
|
| Resource Consent Processing |
2008 |
| Client: Hamilton City Council. Water & Waste Services. |
|
Reviewing resource consent applications, designs, drafting consent conditions, and liasing with council departments on infrastructure issues. Contracted for a 22 week period.
Project complexities:
|
| Environment Waikato Variation 6. Water allocation |
2007 |
| Client: Waikato River Municipal Users Group. WRMUG |
|
Legal counsel headed by Simon Berry Barrister Environmental Law on behalf of WRMUG (Taupo DC, Waipa DC, HCC, Waikato DC, Water Care) presenting legal submissions and evidence to the EW hearings committee. ACD’s role was to provide coverage of the proceedings to capture evidence and report on the hearing proceedings. Late in the hearing, this coverage was a valuable resource used to present WRMUG’s closing submission. 8 week period.
Project complexities: The interests of the different stakeholders in the Users Group.
|
| Avenue Road South Urban Upgrade, Morrinsville. 160m |
|
| Client: Matamata Piako District Council |
Estimated contract value $150,000
|
Professional services to scope, survey, design and prepare contract documentation for the upgrade of a local road in a commercial area. Comprising channelisation, road widening, drainage system review and recommendations, lighting upgrade and services relocation. Subdivision in the area placed pressure for improvements.
Project complexities: Commercial development, state highway and utility operators.
|
| Piakonui Road Culvert Replacement |
2007 |
| Client: Matamata Piako District Council |
Contract value $140,000 |
Professional services involving catchment evaluation, survey, design and preparing contract documentation for the replacement of a partially collapsed Armco culvert. Replaced with a 1.35m diameter Concrete pipe addressing capacity, flooding, maintenance and farm operation issues.
Project complexities: Winter weather conditions and time.
|
| State Highway 2 and Campbell Road Stock Underpasses |
2007 |
| Client: Kaimai Valley Services |
Contract value $260,000 |
Consulting to a contractor to provide professional services for the design and administration of two separate stock underpasses in the Waihi Area. One located on the local road network with the other on Transit operated roads.
Project complexities: Budgets and time constants.
|
| 2002-2007 RAMM Data Processing |
2007 |
| Client: Matamata Piako District Council |
|
Contracted to the District Council to review, coordinate, comply, collating and formatting RAMM data from the district’s road maintenance programme from July 2002 to June 2007. Data presented for inclusion in Council’s RAMM database. Contract period 13 weeks.
Project complexities:
|
| Resource Consent Processing |
2006 |
| Client: Hauraki District Council |
|
Contracted to the District Council on resource consent matters for a period of 10 weeks. Reviewing applications, site inspections, and liasing with council departments on infrastructure issues.
Project complexities: Network limitations.
|
| Resource Consent Processing |
2006 |
| Client: Hamilton City Council. Water & Waste Services |
|
Consulting to the City Council over resource consent matters for a period of 9 weeks. Reviewing and processing applications, and providing arbitration services.
Project complexities:
|
| Matamata
Water Reticulation Upgrades and Renewals. 16.3km. |
2006 |
Client: Matamata Piako District Council.
|
Estimated
contract value $3,857,000 |
Investigation,
design and preparation of contract documents for the LTCCP
water reticulation renewals and upgrades. 32 contracts in
total. The main objective of this project has been to improve
water pressure and quality of service by replacing and upgrading
the network within the Matamata Township.
Project complexities: Budget and network
development.
|
Bankart Street Urban
Upgrade. 720m. |
2005 |
| Employer: Waikato District Council |
Contract
value $2,066,000 |
Designed,
tender preparation and project managed up to stage 3 safety
audit, as part of the ‘Raglan CBD Strategic Roading
Programme’. The project involved a roading and utility
upgrade of urban roads around the Central Business District
in Raglan and re-defines the road function and hierarchy
improving traffic management. Three intersections, two of
which have been upgraded to roundabouts.
Project complexities: Community consultation,
construction during the peak summer business period, planning,
development and Budget.
Bankart Street Project
|
| Box
Culvert Replacement Programme. |
2005 |
| Employer: Waikato District Council |
Contract
value $430,000 |
Scoped,
design, tender preparation and project managed up to contract
supervision. The project involves the widening of Seddon
road and highway 22 single lane bridges with box culvert
structures. Catchment evaluation, culvert sizing and road
improvement works with resource consent applications approved.
Project complexities: Rapidly rising water
levels, erosion control and traffic.
|
| Raglan
CBD Stormwater Strategy. 1.4km |
2004 |
| Employer: Waikato District Council |
Estimates
contract value $700,000
|
Scope
and evaluation of the existing stormwater network and the
recommendations to improved the quality of the runoff into
the harbour.
Project complexities: Resource consents,
budgets, community and council culture.
|
| Rangiriri
Township Waste Water Upgrade 2.1km |
2004 |
| Employer: Waikato District Council |
Estimate
contract value $660,000 |
Scoped
and designed the gravity wastewater system as part of a
central government grant application, which has been approved.
The Township’s growth has been limited to 28 sections
due to environmental issues arising from the concentration
of septic tanks. The upgrade will allow development up to
100 section.
Project complexities: Providing Prevision
for future development. Pumping station and rising main.
|
| Amo
Street Urban Upgrade. 240m |
2004 |
| Employer: Waikato District Council |
Contract
value $192,000 |
Scoped,
designed, tender preparation and project managed up to contract
supervision. The project involved an urban infrastructure
upgrade.
Project complexities: Stormwater disposal.
|
| Culvert
Replacement Programme. |
2003 |
| Employer: Waikato District Council |
Contract
value $180,000 |
Surveyed,
designed, tender preparation and project managed up to contract
supervision. Three separate large diameter culvert crossings
requiring replacement structures.
Project complexities: Resource Consents.
|
| Wallis
Street Urban Upgrade. 760m. |
2003 |
| Employer: Waikato District Council |
Contract
value $650,000 |
Designed,
tender preparation and contract supervision as part of the
‘Raglan CBD Strategic Roading Programme’. The
project involved a roading and utility upgrade of an urban
road close to the central business district, which forms
part of the roading strategic upgrade work for Raglan.
Project complexities: Resource consents
required. Stormwater Discharge to an existing wetland area.
Community input and environmental engineering.
View Images of
The Wallis Street Project
|
| Raglan
CBD Strategic Roading Programme 3.35km |
2003. |
| Employer: Waikato District Council |
Budget
costs $ 7,750,000 |
As
a result of the Raglan Traffic Study, this project focused
on the Central Business District, with the objectives of providing
a strategic roading plan for upgrade works. The programme
extends over a number of years the timing depending on budget
constraints.
Project complexities: Political agendas,
LTCCP, Annual Plan, Needs and aspirations of the community.
|
| Raglan
Traffic Study. |
2002 |
| Employer: Waikato District Council |
|
The
aim of the study was to review the existing road hierarchy
and investigate the issues surround the community’s
sentiments, identify weaknesses and make recommendations for
improvement.
|
| Box
Culvert Replacement Programme. |
2002 |
| Employer: Waikato District Council |
Contract
value $450,000 |
Design,
tender preparation and project managed up to contract supervision.
Four separate large diameter steel culvert crossings requiring
replacement structures.
Project complexities: Resource consents,
Rapidly raising water levels, erosion control and traffic.
|
| Matangi
Footbridge. 30m. |
2002 |
| Employer: Waikato District Council |
Contract
value $120,000 |
Contract
supervision of a structural steel and timber deck pedestrian
and cycle bridge. Span totalling 30m, width 2.5m.
Project complexities: Foundation design,
site restrictions.
View Images
of the Matangi Footbridge Project
Overseas Experience.
Prior to working in New Zealand Richard has sent six years in the UK development industry, with the main focus on urban road design, storm and wastewater infrastructure and utilities relating to the residential market. Site complexities varied from
-
Stormwater attenuation.
-
Demolition and recycling materials.
-
Tree preservation and badger protection orders.
-
Dealing with contaminated land and contaminates from materials during demolition.
-
Traffic impacted assessment.
-
Landslips.
-
Foot and Mouth Epidemic control.
-
Saxon Archaeological site.
-
On-site public wastewater treatment and pumping stations.
|